Warehouses and industrial units
Commercial EPC for Warehouses
When a warehouse needs an EPC, what counts, and the lowest price per square metre of any commercial EPC.
Does a warehouse need an EPC?
Usually yes, but not always all of it. A building that is not heated or cooled for people does not need an EPC. An unheated warehouse used only for storage can qualify.
What almost never qualifies is the whole site. The office at the front, the trade counter and the staff room with a radiator are heated, and they need a certificate. So most units need an EPC that covers the heated parts. The unheated floor is recorded but does not count against the rating.
The assessor decides this on site. Do not assume your unit is exempt before letting it. The fine for getting it wrong is based on rateable value.
Energy rating
CO₂ emissions score
- A0 to 25Most efficient
- B26 to 50
- C51 to 75
- D76 to 100
- E101 to 125
- F126 to 150
- G151+Least efficient
Lower scores are better. New commercial buildings typically target B or better. Sub E ratings cannot legally be let under MEES.
What affects the rating
In order of impact. Knowing them helps you prioritise improvements if your rating needs to come up.
Whether the floor is heated
High impactIf not, the rating is driven by the office. If it is heated, the heaters and the size of the space matter more than anything else.
High bay lighting
High impactOld metal halide or sodium fittings score badly. LED high bay with sensors scores well. On a big floor this is the biggest single change you can make.
The building fabric
Medium impactSingle skin metal cladding with no insulation loses a lot of heat. Modern insulated panels rate far better.
Roller shutter doors
Medium impactRecorded for size and whether they are insulated. Doors kept open in a heated space lose a lot of heat.
Mezzanines
Low impactCount towards the floor area if they are enclosed and heated.
The office
Variable impactAssessed like any office. On a unit with an unheated floor, the office decides the rating.
Prices and what to expect
Big floor areas and a fast visit, which is why industrial units cost the least per square metre.
- Price is by floor area, including any heated mezzanine. Put it into the quote calculator for your fixed price. Over 4,000 m² we quote individually.
- Most units are Level 3. Very large sheds with complex ventilation can be Level 4.
- The visit takes 1 to 2 hours, even on a large floor. Open space is quick to record.
- You need an E or better to let, the same as every other commercial building. LED lighting is usually the fix.
How Kubo works
Get an instant quote
Pick your service, enter your floor area, and see a fixed price in 60 seconds. Or call 07737 144 836.
Book in seconds
Pay securely online or over the phone. We confirm your slot the same day, often within the hour.
Certified in days
We contact you to schedule the visit, then complete your order as soon as possible.
Frequently asked questions
Is my warehouse exempt?
Only the parts that are not heated or cooled for people can be exempt. The heated office, trade counter and staff areas need a certificate. The assessor decides on site.
How much is an EPC for a warehouse?
A fixed price by floor area, including any heated mezzanine. Put your floor area into the quote calculator for your fixed price. Units over 4,000 m² are quoted individually.
Does an unheated warehouse floor count against the rating?
No. Space that is not heated or cooled is recorded but does not add to the energy the building needs. The heated office decides the rating.
What is the quickest way to improve a warehouse rating?
Change old high bay lighting to LED with sensors. On a big floor it is usually the biggest improvement available and often pays for itself faster than anything else on the report.
Get your Commercial EPC